Mayneord Factor
* Overestimates the increase in PDD with increase in SSD
* Overestimates for small field sizes
* MF = ((f2+ dm) /(f1 + dm))squared x ((f1 + d) / (f2+ d))2
Friday, June 06, 2008
Subscribe to:
Post Comments (Atom)
A Blog designed to capture various facts, concepts and figures about the practice of medical physics. Originally focused on study for the ABR board exams.
No comments:
Post a Comment